Use enter to open, Escape to close
Planning and Development

Bid Opportunities (RFP/RFQ)

Request for Proposals (RFP) - Hospital Road Transformer
03/30/2026

Sealed Proposals to furnish specified materials and services for Outdoor Power Transformer will be received by the Town of Smithfield, Smithfield, North Carolina until 2:00 pm, local time May 12, 2026, at which time all bids will be publicly opened and read at the Town of Smithfield Utilities Operations Building.

 

Bid Documents


It is the sole responsibility of the Bidder to ensure delivery of the bid at the designated place and time. Late delivery of bids for any reason including delivery by the USPS or by other courier shall disqualify the bid. All proposals received after the designated time for bid opening will be considered invalid and promptly returned to the Bidder unopened.


Proposals must be submitted in a sealed envelope bearing the name and address of the bidder.

Proposals should be delivered to the following address:

 

Ted Credle, P.E.

Director of Public Utilities

Town of Smithfield

230 Hospital Road

Smithfield, NC 27577


Proposals transmitted via facsimile (fax) or e-mail directly to the Town will not be considered sealed bids and will be rejected.

 

Bidders shall clearly identify their proposal as a sealed bid by including the following text on a conspicuous area of the envelope.


“PROPOSAL FOR OUTDOOR POWER TRANSFORMER. DO NOT OPEN UNTIL 2:00 P.M., _ May 12, 2026 _”


Request for Proposale (RFP) - Project I-95 Gravity Sewer Crossing and Pump Station No. 11 Replacement
03/26/2026

The Town of Smithfield is requesting Bids for the construction of the following:

Project: I-95 Gravity Sewer Crossing and Pump Station No. 11 Replacement


Bids for the project construction will be received at:

Town of Smithfield - Department of Public Utilities located

230 Hospital Road, Smithfield, NC 27577

 

Bids will be received until April 2, 2026 at 2:00 p.m. local time.

At that time, the Bids received will be publicly opened and read aloud.

 

The Project includes the following Work:

1. Demolition and Replacement of PS No. 11

2. Abandonment of existing 8-inch gravity sewer and installation of 16-inch gravity sewer from Ex. SSMH No. 2A to SSMH No. 7, totaling approximately 1,153 LF, which includes 326 LF of 30" Steel Encasement with 16-inch gravity sewer by bore and jack under I-95.

3. Installation of 16-inch gravity sewer from Ex. SSMH No. 2017 to Ex. SSMHA No. 2A, totaling approximately 309 LF of sewer.

 

Project Advertisement

Project Addendum